Font Size
15px

"After discussing and synthesizing multiple opinions, here’s the final design plan." In the living room of Chen Xin’s shelter, the designer responsible for submitting the design proposals was introducing the whole plan to him: "The main part of the Ecological Do has a maximum diater of 512 ters, the radian of the do itself is 1.1 rad, making it a perfect circle structure. The diater of the ground part is 496 ters, the do’s highest height is 41.2 ters, and the building is divided into three above-ground levels and one underground level."

"The interior adopts a circular layout, with the center consisting of a small ecological circle and a heating hub providing heat for the entire building, forming an atrium. The main body of the building is distributed around this central atrium."

"The above-ground part is mainly used for various laboratories, while the underground part serves as a weapons testing ground and storage warehouse, with space reserved for experintal institutions that may need to be located underground for contingency purposes."

After listening to the structural introduction of the Ecological Do by the designer, Chen Xin was quite satisfied with this design. However, he pondered and asked, "Where are the military camp and the planting greenhouse I previously ntioned located, and are you planning to use the heating hub to provide warmth to the Ecological Do?"

"Yes, the heating hub and Energy Tower technology are very efficient ways to utilize geothermal energy and can be directly converted into electricity. Compared to building another power plant for power supply and a boiler for heating, constructing a geothermal power plant can not only obtain efficient and clean energy but also provide heating for the Ecological Do, making the investnt much smaller than other options." The designer clearly considered many plans before finally choosing the current design sche.

Chen Xin didn’t say much about this. Although the technology originated from him, he didn’t feel proud or have other emotions; he simply nodded affirmatively and said, "Using the heating hub to warm the Ecological Do is indeed sufficient, but it seems like you’re thinking of calculating the electricity separately?"

"Yes, according to our design, an Energy Tower will be built near the Ecological Do to extract underground heat for power generation, and the remaining energy will be transmitted to the heating hub inside the Ecological Do for warmth, while the circulating dium will be re-injected underground through the return well beneath the heating hub." The designer, having adopted this plan, is undoubtedly well-versed in the relevant technology.

"Hmm, this is quite a good application; it can generate electricity and provide heating. Very good." Chen Xin nodded, affirming the design of this plan. But he looked over the blueprints again and continued to ask, "So, you placed the planting greenhouse and military camp outside the Ecological Do? Although connected, they’re not placed inside the main body of the Ecological Do?"

"That’s right, because according to our calculations, while it’s not impossible to fit the planting greenhouse and military camp inside the Ecological Do, it would an a lot of space inside will be occupied, making it feel very cramped. So, it’s better to adopt this layout that spreads out more." The designer explained his design concept and even made notes on the blueprints: "We’ve designed the military camp as the main entrance. To enter the Ecological Do area, you’d have to go through the area where the military camp is located, which also serves security and screening purposes.

On both sides, there are the geothermal power plant and planting greenhouse areas, respectively located on the sides of the Ecological Do, presenting an overall triangular layout. This way, each part gets enough space while being relatively compact."

"You guys know better in these aspects, so let’s go with your design as long as it ets my usage needs. There’s no problem otherwise." Chen Xin didn’t express differing opinions or views on this matter; he nodded before continuing to ask, "Regarding construction, what are your plans? Using the heating hub to lt the snow first and then leveling the ground before construction?"

This was the thod Chen Xin previously used at Lin City Railway Station and was also the original intention of his heating hub design. Considering that there was similarly more than ten ters of snow in front of his house, Chen Xin first thought of this construction thod.

"Yes, so we will first complete the construction of the geothermal power plant and the heating hub, and then proceed with the construction of the Ecological Do and other buildings." Facing Chen Xin, the client, the designer answered his questions in great detail, leaving nothing unsaid: "Once the geothermal power plant and heating hub parts are completed, we’ll begin to lay the foundation of the Ecological Do and simultaneously start the military camp construction.

After laying the foundation, we’ll proceed with the construction of the main steel structure support of the Ecological Do using the 3D printing robots you, Academician Chen, provide. Once the entire structure is completed, we’ll install the glass facades of the do and construct the internal structures."

"Are the glass facades reliable? Although the frequency of teor falls has greatly reduced, occasional teor fragnts still fall to the ground, right? How did you consider this aspect?" It’s no wonder Chen Xin had this question, as Blue Star’s current disasters stem from teor impacts.

In the past year or more, even though Fla Country wasn’t the main disaster area for teor collisions, fiery teors were often seen falling from the sky.

In such circumstances, not to ntion whether it can withstand sporadic teor impacts, at least it should ensure that post-impact, the entire building facade doesn’t shatter completely, necessitating a complete rebuild.

"We have adopted a multi-layer composite structure for the glass facades, with tempered glass as the main material, added with lamination to prevent shattering. Moreover, the glass itself has a heat-absorption coating, capable of adjusting transparency according to light intensity, ensuring the maximum acquisition of natural light and radiation, while providing insulation." The designer clearly gave it thorough consideration, particularly flipping through the blueprints to show the glass facade design, introducing it to Chen Xin proudly: "Considering potential teor impacts, we adopted a hexagonal honeycomb-like splicing design for the glass facades. If an impact occurs, so glass might be shattered but won’t shatter completely.

Additionally, we’ve adjusted the building’s internal structure. Even if explosions or teor impacts occur due to various factors, the impact on the glass facades won’t be strong, nor will it lead to the breakage of all glass facades on the entire building."

"If that’s the case, I have no other opinions. Proceed with the construction according to your design plan." Chen Xin felt he had learned enough and decisively said, "As for the 3D printing robots needed for construction, I’ll provide them to you before the comncent of work."

You are reading I can upgrade the shelter Chapter 408 - 406: Preparing to Start Work on novel69. Use the chapter navigation above or below to continue reading the latest translated chapters.
Share with your friends
Library saves books to your account. Reading History saves recent chapters in this browser.
Continuous reading

You may also like

Lord of Prayer cover
Similar genre

Lord of Prayer

Sea is Water ·Sci-fi

ZhouChenunexpectedlyobtainsamysteriousWishBottle.Byfulfillingthewishesofothers,hecanacquire“WishPoints”toenhancehimself.“Well,doyouguyshaveanywishe...

No reviews yet. Be the first reader to leave one.
Please create an account or sign in to post a comment.